Some of our projects
The Prince London | Data points installation
Client: The Prince London – Restaurant, Pub and Bar in Earls Court.
Project brief:
- installation of additional Cat5e data points for tills and pdq machines.
La Tua Pasta | Cat6 Cabling, Wi-Fi Networking
Client: La Tua Pasta is a producer of fresh Italian pasta based in West London and our long-standing client.
Project brief:
- installation of additional 7x Cat6 data points and 4x UniFi Wi-Fi access points in the factory.
The Broadgate Tower, 20 Primrose Str. | Comms room cable management
The client moved to a new office and inherit a comms room from a previous tenant. The comms room includes 3 x 42U racks and 1x Panduit NetRunner Vertical Cable Manager consisting of 14 x48 port patch panels.
Patch panels were connected to 7x stackable 48 port Cisco Catalyst switches with long patch leads which makes access to switch ports and patch panels absolutely unmanageable.
Project brief:
- decommision old patch leads
- re-position switches and patch panels for optimal cable management
- patch ports needed with 2U patch leads
Whippendell Marine | Cat6 Cabling
Client: Whippendell Marine is an electrical engineering business, specialising in electrical solutions for Naval and Marine Applications moved office and warehouse from Watford to Milton Keynes.
Project brief:
- installation of 88 x Cat6 data points in office and warehouse
Judicium Educationt – Fareham | IT infrastructure refresh
Client: Judicium Education – is a professional services company operating in the education sector
Project brief:
- decommission old comms cabinet
- install new IT rack
- cable management
Private Client | Complete IT/AV Solution
Client: Private client | Yaffle Road, St. Georges Hill, Weybridge , KT13
Project brief:
- installation of Cat6 data points, Sky/Freeview, HDMI plates
- installation of data cabinet, comms equipment
- UniFi AP-AC-Pro wireless access points
Private Client | Whole House Wireless solution
Client: Private client | Cavendish Road, Weybridge, KT13
Project brief:
- 11 x UniFi AP-AC-Pro wireless access points
- 1 x UniFi Switch 16 POE-150W
- DrayTek Vigor 2862 router
Fast Medica | Complete IT Solution
Client: Fast Medica is a specialised multi service medical centre.
Project brief:
- installation of Cat5 data points
- installation of UniFi wireless access points
- installation of comms cabinet, comms equipment
- installation of server and computers
Services:
- ongoing IT support and maintenance
UKCBC | Installation of Ubiquity airFibre Point-to-Point Gigabit Radio
Client: UK College of Business and Computing is a leading provider for Higher Education and Training programmes in London.
Requirements
The client requested assistance in installing Ubiquiti airFibre Point-to-Point Gigabit Radio antennas between two campuses in Gants Hill.
Jan de Rijk Logistics – Installation of Cat5e data points
Client: Jan de Rijk Logistics – based in the Netherlands, is a leading provider of transportation and distribution services, operating a large, modern and diversified fleet of 1000 vehicles across Europe.
Requirements
The client requested assistance in installing additional data points in their warehouse in Hounslow.
Project Brief
- Installation of Cat5e data points
- Labeling
- Test and certify data cabling installation with Fluke Cable IQ Qualification Tool
Choice Telecom UK – Installation of Cat5e data points
Client: Choice Telecom UK – Choice Telecom UK are a dedicated contact center offering specialized sales and customer service, customer retention management, and revenue generation.
Requirements
The client requested assistance in installing 76 Cat5e data points in their new office in Ealing.
Project Brief
- Installation of 76 Cat5e data points
- Installation of patch panels
- Labeling
- Test and certify data cabling installation with Fluke Cable IQ Qualification Tool
London Legacy Development Corporation – Installation of Cat6 data points, Elektrak power sockets
Client: London Legacy Development Corporation – the London Legacy Development Corporation’s purpose is to use the once-in-a-lifetime opportunity of the London 2012 Games and the creation of Queen Elizabeth Olympic Park to develop a dynamic new heart for east London, creating opportunities for local people and driving innovation and growth in London and the UK.
Requirements
The client requested assistance in installing additional Cat6 data points and Elektrak power sockets (underfloor to workstation power).
Project Brief
- Installation of Cat6 data points
- Installation of Elektrak power sockets
- Apply Firestopping solution
- Test and certify data cabling installation with Fluke Cable IQ Qualification Tool
UKCBC Wentworth House – Main Campus: Cable Management, Rack Management and Rationalization
Client: UK College of Business and Computing is a leading provider for Higher Education and Training programmes in London.
Requirements
The client requested assistance in management of the comms room in their main campus – Wentworth House, Gants Hill.
Project Brief
- removal all equipment from old racks and assemble 2 x 42U racks
- install all equipment into new racks grouping equipment by functions
- trace/label/tidy up all cables
- install PDUs, KVM drawer
Lawson S. Stone – Cable Management
Client: Lawson S. Stone – an independent Surrey estate agency specialising in sales, lettings and property management
Requirements
The client requested assistance in cable management in their office.
Residential Property – Structured Cat6 cabling, Wireless network installation
Client: Private residential property in Torwood Lane, Whyteleafe
Requirements
The client requested assistance in installing Cat6 data points and Wireless network throughout the house.
Project Brief
- Installation of Cat6 data points
- Installation of comms cabinet, network switch, patch panel
- Installation of Ubiquity UniFi Wireless access points
- Certify data cabling installation with Fluke Cable IQ Qualification Tool
- Testing and commissioning
Technologies
- Excel Cat6 Structured Network
- Ubiquiti UniFi UAP AC
- DrayTek network switch
UKCBC – Holborn Campus: Structured Cabling, Wireless, CCTV Installation
Client: UK College of Business and Computing is a leading provider for Higher Education and Training programmes in London.
Requirements
The client requested assistance in installing 200 data points, Wi-Fi access points and CCTV throughout their new 7 storey building in the heart of Holborn (London).
Assessment
In partnership with CCTV4UK, an initial survey was conducted to assess the project. The survey report concluded that the project was to be completed in 3 phases within a month and a half.
Solution
Inspecting the building with the project manager, we had to coordinate this project with other contractors and management to timely complete each phase, not allowing any disruption on the completion. Phase 1: Installing the cat5e structured cabling, for the data points, Wireless access points and CCTV cameras. Phase 2: Finishing the structured cabling data points, installing the CCTV dome cameras and installing the Wireless access points. Phase 3: Assembling and arranging comms cabinet, installing the patch panels, and testing the infrastructure.
With the Comms cabinet in order we tested the entire structured cabling using our fluke tester to determine data speeds and compliance.
Project Brief
- Decommission old structured cabling and equipment
- Installation of Excel structured cabling (200 Cat5e data points)
- Installation of CCTV Cat5e cabling
- Installation of Wireless access points Cat5e cabling
- Mounting 32 CCTV Dome Cameras
- Installation and Configuration of Wi-Fi Access Points
- Configuration of NVR
- Assembling and arranging comms cabinet
- Installation of patch panels, switches, PDU
- Trace and label patch panel ports and cables
- Wi-Fi signal and performance assessment
- Certify data cabling installation with Fluke Cable IQ Qualification Tool
- Testing and commissioning
Technologies
- Excel Cat5 Structured Network
- Ubiquiti UniFi UAP AC
- Netgear Switches
- Qvis CCTV
Results
The project took us 1.5 months in 3 phases to complete, with some challenges and delays. Overall the client was very pleased with our work and efforts. In return they assigned another project to us close to Oxford Circus. Another project completed with success.
Chebar Group – Structured Cabling, AV, CCTV Installation
Client: Chebar Group – Real Estate
Requirements
The client fully refurbished new office building and requested assistance in removing old structured cabling, relocating of comms cabinet and equipment, relocating of CCTV system, installing new Cat5e structured cabling, in-ceiling speakers, Sonos multi-room audio system and new HD TVI CCTV system.
Project Brief
- Removal of old cabling/equipment
- Installation of Excel Structured Cabling – 24 Cat5e outlets
- Installation of comms cabinet
- Installation of speakers, amp, Sonos
- Testing and commissioning
- Certify data cabling installation with Fluke Cable IQ Qualification Tool
Leica Cameras – Cable management, Network support
Client: Leica Cameras – an internationally operating, premium-segment manufacturer of cameras and sport optics products.
Requirements
The client requested assistance in decommissioning an old server rack and relocating the network equipment to a wall mounted cabinet.
Assessment
An initial survey was performed to determine and assess the current rack. The survey report concluded that there was no difficulties in decommissioning of the rack. The state of the rack was pretty poor and had not been maintained for months.
Solution
Inspecting the rack, we decided to first remove any of the equipment that wasn’t functioning or in use. The next step was to check and test all the network cables to correct or replace them. Once the testing of the cables was completed, we relocated the patch panels and network equipment to the new cabinet. The final process was to trace and label patch panel ports and cables.
With the cabinet in order we proceeded to test the network infrastructure performance.
Project Brief
- Decommission old rack and equipment
- Replace and Repair Cat5 cables
- Relocate network equipment to wall cabinet
- Trace and label patch panel ports and cables
- Network performance assessment
- Testing and commissioning
Results
The project took us 2 days to complete, with minor challenges. Completing this recommissioning of their rack has solved all the issues that have been frustrating the client for quite some time. A rack decommissioned and recommissioned with success.
La Tua Pasta – Structured Cabling, Wi-Fi Networking
Client: La Tua Pasta is a producer of fresh Italian pasta based in West London.
Requirements
The client requested assistance in installing 56 data points and Wi-Fi access points throughout their new factory.
Assessment
An initial survey was performed to determine the route and access point locations. The survey report concluded that there was some difficulties and issues with the structured cabling route and distance from the Comms cabinet.
Solution
Inspecting the cabling route, we decided to use shielded twisted-pair network cables to protect it from electromagnetic interference caused by high voltage refrigerators. The next step was to check and determine the shortest route possible that we can use to make this project cost effective without using high end network repeaters. With a solution brought to us by our project manager we successfully managed to stay within the 100 metre limit. Having a route in place, we installed 56 data points and 4 cloud-managed wireless access points throughout the factory.
With the Comms cabinet in order we tested the entire structured cabling using our fluke tester to determine data speeds and compliance.
Project Brief
- Installation of 56 Cat5 data points
- Installation of 4 wireless access points
- Assembling and arranging comms cabinet
- Installation of patch panels, switches, PDU
- Certify data cabling installation with Fluke Cable IQ Qualification Tool
- Testing and commissioning
Technologies
- Open Mesh Dual Band 802.11ac Wi-Fi Access Point
- Excel Cat5 Structured Network
Results
The project took us 4 days to complete, with very minor challenges and delays. Overall the client was very pleased with our work and efforts. A superior structured network completed with success.